Skip to main content

Czech tunnel link proposed as alternative

A new road tunnel link has been proposed for the town of Bilina in the Czech Republic. The project has been put forward by the country’s state road and motorway management company RSD as an alternative to the bypass originally proposed. At present the E442 route passes straight through Bilina, which is located in the north of the country and close to the border with Germany. However the road link is not considered suitable and a bypass costing an estimated €252.15 million was suggested as a way to carry tra
November 11, 2019 Read time: 1 min

A new road tunnel link has been proposed for the town of Bilina in the Czech Republic. The project has been put forward by the country’s state road and motorway management company RSD as an alternative to the bypass originally proposed. At present the E442 route passes straight through Bilina, which is located in the north of the country and close to the border with Germany. However the road link is not considered suitable and a bypass costing an estimated €252.15 million was suggested as a way to carry traffic around the town. The 1.3km tunnel has been suggested instead as it is thought to be around half the cost of the bypass. However the project still has to receive approval from the Transport Ministry as well as other necessary regulatory approvals.

Related Content

  • Legal battle for Croatia’s Peljeski Bridge contract continues
    April 19, 2018
    Only days after Croatia rejected initial complaints, contractors Astaldi, Ictas and Strabag said that they will submit new complaints over the Peljeski bridge winning bid. Croatian media report that Turkey's Ictas, Italy's Astaldi and the Austrian company Strabag are planning to submit a new complaint to the Croatian High Court against a decision by the state procurement authority DKOM to reject their previous complaints. At issue is the awarding of the Peljeski bridge and access roads project to the
  • Cost expectations increase for Stockholm Bypass project
    February 6, 2024
    The cost for Stockholm Bypass project could be up to €4.7 billion.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m