Skip to main content

Czech Republic highway deal for consortium

A highway deal in the Czech Republic will be handled by a consortium.
By MJ Woof October 8, 2020 Read time: 2 mins
STRABAG and Eurovia will handle a highway project in the Czech Republic jointly – image © courtesy of Indos82, Dreamstime.com
A consortium will handle a key highway project in the Czech Republic. The €105.5 million contract for the D55 motorway in the Czech Republic has been awarded to a consortium comprising Austrian contractor STRABAG and the Czech subsidiary or French firm Eurovia. The consortium partners have equal 50% shares in the contract.

The work is for the construction of an 8.5km section of highway between Babice and Staré Město and is expected to take 42 months to complete. This stretch of the D55 highway is in the Zlín Region, located in the South East of the Czech Republic and on the border with Slovakia.

“When fully completed, the D55 motorway will be the most important transport corridor connecting the Czech business centres of Olomouc, Zlín and Břeclav. We are pleased to be contributing our extensive transportation infrastructure experience to the further expansion of an efficient Czech motorway network,” said Thomas Birtel, CEO of STRABAG.

The project features a number of engineering challenges to its construction, not the least of which is the need to build 18 bridges along the 8.5km stretch. The builders will also have to construct six retaining walls with a total length of around 1.8km, two noise barriers with a length of around 2km and 28 structures for water management.
 

For more information on companies in this article

Related Content

  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Slovakia’s D1 highway project underway
    August 11, 2022
    Work on Slovakia’s D1 highway project is underway.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.