Skip to main content

Czech Republic: bad bridges report

The Czech government’s road and motorway directorate RSD has reported that thousands of bridges in the country are in a critical state. Nearly 10% or the 5,000 motorway or first-class road bridges are in bad, very bad or emergency condition. The same applies to almost 3,000 bridges on second- and third-class roads. RSD has allocated around €69 million for repairs of bridges at main roads and motorways this year
March 6, 2018 Read time: 2 mins
The Czech government’s road and motorway directorate RSD has reported that thousands of bridges in the country are in a critical state.


Nearly 10% or the 5,000 motorway or first-class road bridges are in bad, very bad or emergency condition. The same applies to almost 3,000 bridges on second- and third-class roads.

RSD has allocated around €69 million for repairs of bridges at main roads and motorways this year

The report comes at the same time the Liben Bridge - one of Prague’s main bridges - was closed to traffic after a report highlighting its dangerous state, according to Radio Prague.

In December, a pedestrian bridge over the Vltava River in Prague collapsed but no one was injured.

The 370m-long 21m-wide road and tram Libeň Bridge was closed for several weeks after a report warned against the condition of several sections. A vehicle weight restriction was needed, according to the report, but the city closed the bridge to all traffic except pedestrians while repairs were carried out.

It's estimated that around 14,000 cars and 1,000 trams use the 90-year-old concrete and stone bridge daily.

Related Content

  • Severn Bridge to have weight restrictions
    April 15, 2025
    The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Diefenbaker Bridge saved from tolling
    February 11, 2020
    Canada's Prince Albert city will not toll the ageing two-lane Diefenbaker Bridge
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.