Skip to main content

Czech highway project benefiting from ground support

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway
August 6, 2012 Read time: 1 min

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway. This work has been delayed however due to concern over the environmental aspects of the ground support required. The environment permit was withdrawn for a 30% section of the area requiring the ground support work, which will delay the project by three months or more and looks likely to increase overall costs. The ground support activity is continuing on the rest of the affected area in the mean time.

Related Content

  • GPS machine control boosts productivity
    February 23, 2012
    New technology can allow more productive and more cost-effective earthmoving jobs. Mike Woof reports
  • Bridge under discussion for UK’s River Thames
    June 19, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Terex Trucks work on Austria’s North Autobahn A5 Vienna to Brno
    January 27, 2017
    Regional contractor Windisch has put five Terex TA300 articulated haulers to work shifting 1.4 million m3 of earth on the A5 motorway extension in Austria. The five 28tonne capacity TA300s have been selected by local contractor Windisch to take part in the expansion of the North Autobahn (A5) which will form a modern highway between Vienna in Austria and Brno in the Czech Republic. Austrian distributor Mlecka Construction, just outside of Vienna in Oeynhausen, supplied the vehicles that work 12-hour s
  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.