Skip to main content

Czech highway project benefiting from ground support

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway
August 6, 2012 Read time: 1 min

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway. This work has been delayed however due to concern over the environmental aspects of the ground support required. The environment permit was withdrawn for a 30% section of the area requiring the ground support work, which will delay the project by three months or more and looks likely to increase overall costs. The ground support activity is continuing on the rest of the affected area in the mean time.

Related Content

  • Developments in hybrid vehicles
    February 27, 2012
    There is an array of future vehicle solutions in development - Mike Woof reports. Ever since Henry Ford's Model T showed that the motor car could provide transport for ordinary people rather than being an exclusive toy of the rich, vehicle numbers have exploded. In every country around the world, vehicle ownership continues to grow.
  • Need for sustainability in infrastructure projects
    July 13, 2012
    What can contractors gain from a sustainability strategy and why is it now a vital business imperative? Abigroup, one of Australia's leading and most diverse national contractors, has developed a sustainability strategy suited to its industry, workforce and business. World Highways discusses this and other issues with Sarah Marshall, Abigroup's national environment and sustainability manager. In the past a responsible business was viewed as one that performed strongly within legal boundaries to maximise pro
  • IRF launches Contract Maintenance & Asset Management Seminar
    July 11, 2012
    Ever since the first wheel travelled along its first path, roads have needed regular maintenance in order to provide the safest route possible to one's desired destination. For today's roads, the maintenance activities that must be performed, their scheduling and the methods of execution are in a continuing state of evolution. And this requires a significant amount of planning by those who operate and manage the road systems.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v