Skip to main content

Czech highway project benefiting from ground support

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway
August 6, 2012 Read time: 1 min

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway. This work has been delayed however due to concern over the environmental aspects of the ground support required. The environment permit was withdrawn for a 30% section of the area requiring the ground support work, which will delay the project by three months or more and looks likely to increase overall costs. The ground support activity is continuing on the rest of the affected area in the mean time.

Related Content

  • Tanzania delivers road construction boost
    November 2, 2012
    Plans to upgrade two major roads in Tanzania will bring huge benefits to the East African nation. Shem Oirere reports Tanzania’s bid to retain or improve its position as East Africa’s second largest economy is gaining momentum as the government moves to support the achieved growth and contribute more to ongoing regional economic integration through the improvement of its transport infrastructure. The country received a major boost in April, 2012, when the African Development Bank (AfDB), one of Tanzania lea
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Stafford road project underway
    July 8, 2025
    Work is underway in the UK for a key Stafford road project.
  • Concern over glass bead quality grows
    March 1, 2012
    Further evidence is emerging of the potential risks of glass beads used for road markings supplied by Chinese firms.