Skip to main content

Czech bypass project faces delay

An important Czech bypass project is facing delays.
By MJ Woof September 18, 2020 Read time: 1 min
An important bypass project in the Czech Republic is now facing delays - image © courtesy of Artof Sha, Dreamstime.com
Delays are now affecting construction work for the Czech Republic’s Ceske Budejovice bypass project. As a result, the bypass will not be ready for traffic until 2024.

Geological problems in the Pohurka Tunnel are at the heart of the delays. Dealing with unexpectedly high levels of groundwater will add around €3.88 million to the project. In all, the project is costing around 204.9 million.

Related Content

  • Resolution for delayed Texas bridge project
    October 23, 2023
    A resolution has been reached for a massive Texas bridge project.
  • Challenging Serbian highway project
    March 15, 2021
    A challenging Serbian highway project is being planned.
  • Brazil Tamoio highway and São Sebastião tunnel work
    July 5, 2016
    Brazil’s Tamoio Highway and São Sebastião tunnel construction is of major importance – Mauro Nogarin reports. The modernisation and expansion of Brazil’s Tamoio highway is a major project for Brazil. The project has an estimated cost of $1.5 billion and work on the first section from Planalto was completed in January 2014, costing around $350 million. The project is being managed by the state-owned agency DERSA, which deals with road development. According to the concessionaire for the Tamoios highway p
  • Morocco’s big bridge for Rabat bypass
    January 9, 2015
    Construction work is on track with the new cable-stayed bridge close to Morocco’s coastal city of Rabat. The cable-stayed bridge will form part of Rabat’s new bypass and will be the largest such structure in Africa when it is complete, later this year. The bypass crosses the Bouregreg valley and measures some 41km. The bridge itself will measure 950m and span 376m, with three lanes in each direction. Construction of the bridge has been financed by the World Bank and Autoroutes du Maroc (ADM) and is costing