Skip to main content

Croatia road and bridge projects

China Road and Bridges Corporation (CRBC) is the main contractor for Croatia’s Peljeski road and bridge construction project. A number of local firms are in discussions regarding sub-contracts for the project. The link will cost around €264 million to construct. The Croatian firm Brodosplit is in discussions to supply the 70,000tonnes of steel required for the bridge.
January 23, 2018 Read time: 1 min

China Road and Bridges Corporation (CRBC) is the main contractor for Croatia’s Peljeski road and bridge construction project. A number of local firms are in discussions regarding sub-contracts for the project. The link will cost around €264 million to construct. The Croatian firm Brodosplit is in discussions to supply the 70,000tonnes of steel required for the bridge.

Related Content

  • China opts for domestic Montenegrin firms
    March 17, 2017
    China Road and Bridges Corporation has reportedly appointed 67 Montenegrin contractors for its work in Montenegro. Contractually, CRBC must have at least 30% of the work going to Montenegrin firms, according to the national Montenegrin roads company Monteput. Monteput also said that the value of construction work in 2016 grew by over 30% to €383 million in comparison with 2015.
  • New road and bridge project planned for Myanmar
    January 16, 2019
    Work on a new road and bridge project is planned to start in Myanmar during 2019 and is expected to take until 2022 to complete. The construction of this new link will improve transport connections with neighbouring China. The US$100 million project will be carried out in Myanmar’s Shan State, lying on the country’s eastern border with China. In all, the new bridge and road will run for 19.3km and will link Nawngcho with Gote Hteik. The existing road passes through a mountainous area along this stretch and
  • Kenya’s bridge maintenance woes persist
    May 10, 2018
    Many of Kenya’s bridges are in poor condition writes Shem Oirere. The lack of programmed maintenance of bridges in Kenya continues to undermine the structural integrity of the infrastructure and compromising their general usage safety despite the existence of approved measures to protect them from falling into a state of disrepair. Experts think that both the absence of a maintenance component in bridge construction contracts, especially for those built one or two decades ago, and a weak maintenance supervi
  • Project underway for Chinese bridge
    May 15, 2014
    Potain tower cranes are being used to construct a major cable-stayed bridge in China. The conditions are tough and feature high winds and monsoon conditions, with the cranes working at an altitude of 1,500m above sea level in a mountain range in southern China to build the Duge Beipanjiang Bridge, which will span 720m when it is complete The job is requiring six Potain tower cranes in total during the course of the US$92.75 million (570 million RMB) project. Two cranes have been erected at the job site a