Skip to main content

Croatia: Peljeski Bridge decision in summer 2017

Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017. The project, valued at around €370 million, will be carried out in three phases. In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues. The State Commission for Control of Public Ordering recently rejected the pre-qualificatio
November 21, 2016 Read time: 2 mins
Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017.

The project, valued at around €370 million, will be carried out in three phases.

In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues.

The State Commission for Control of Public Ordering recently rejected the pre-qualification complaints and the tender is going forward, according to Croatian media.

Around 80% of the cost will be co-financed by the European Commission’s body for large infrastructure projects, JASPERS - Joint Assistance to Support Projects in European Regions.

According to construction plans accepted in 2007, the project is for a 21m-wide cable-stayed bridge carrying four lanes across the entrance to Mali Ston Bay. The main span would be 568m and likely be the second largest in Europe. The two main pylons would reach 170m above sea level.

The project also calls for access roads at both sides of the bridge. Work would include two tunnels on Pelješac - one nearly 2.2km long and the other at 450m - as well as two smaller bridges on Pelješac, one 500m long and the other only 50m.

Once completed, this bridge would physically connect all of Croatia, which is now interrupted by a strip of land belonging to Bosnia and Herzegovina.

Start of construction has been continuously delayed until shipping rights and boundaries can be properly defined between the two countries. Klek is at the entrance to the 21km long Mali Ston Bay and the small Bosnian town of Neum is at the end. The bay, with a maximum width of 2.2km and depth between 7-28m, is well-known for oysters and mussel farming.

There have been concerns by Bosnia about possible obstruction of cargo ships bound for Neum. The Bosnian government is planning to upgrade the infrastructure of Neum, the only Adriatic access for Bosnia along its 20km of coastline.

Related Content

  • How Croatia tackles its weight problems
    July 19, 2012
    Karin Junker, Regional Sales Manager Eastern Europe and Russia, HAENNI Wheel Load Scales, Switzerland, looks at weight enforcement in Croatia Croatia's modern period in history began in 1990 with the country's change of political and economic system, and the achieving of independence from Yugoslavia on 25 June, 1991. The country remained war torn during the 1990s but regained stability and economic growth after the turn of the millennium. During a recent trip to Croatia to visit HAENNI's distributor in t
  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Doboj headed for a 5C bypass
    November 2, 2020
    The 53km bypass is part of upgrading for the European route Corridor 5C.
  • Polish projects to get Cohesion Fund cash
    March 6, 2018
    Almost €790 million will be allocated from the Cohesion Fund for three road projects which improve the country's communication with Germany and other Western and Eastern European countries. Around €270 million will be for the Garwolin-to-Kurow S17 dual carriageway, another €125 million to build a stretch of the S6 dual carriageway between Goleniow and Kielp and €390 million for the S2 on the outskirts of Warsaw.