Skip to main content

Croatia issues permit for bridge over Sava River

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina. Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports. The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering. Croatia is to pay €70 million as its share for a bridge across the R
March 25, 2019 Read time: 1 min

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina.

Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports.

The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering.

Croatia is to pay €70 million as its share for a bridge across the River Sava near Gradiska, in Republika Srpska, part of Bosnia-Herzegovina.

A year ago, the 2465 European Commission set aside a €6.8 million grant for construction of the bridge.

For more information on companies in this article

Related Content

  • Romanian roads under construction
    May 9, 2012
    Funding worth some €177.5 million from the European Commission (EC) will pay for a highway construction project in Romania. This non-refundable financing will pay for the construction of a 27.4km stretch of the Lugoj-Dumbrava highway. This section forms part of Lugoj-Deva highway that is itself a part of the Pan-European Corridor IV.
  • AmeySRM awarded UK's A533 bridge work
    July 14, 2020
    Under the €23 million contract work will start early 2021 for completion in summer 2022.
  • Portugal and Spain to revamp a bridge over the border river Guadiana
    September 22, 2015
    The Portuguese road operator Infraestruturas de Portugal is to tender a €13 million contract for refurbishment of the international bridge over the Guadiana river, connecting Vila Real de Santo Antonio in Portugal and Ayamonte in Spain. The work will take 18 months and the cost will be shared by both countries, a report in Diário Económico said. Around 80% of the river is in Portugal. The river flows east to west through Spain, then south through Portugal, then forming the Spanish-Portuguese border
  • Hungarian highway getting underway
    April 25, 2012
    Work to construct a new stretch of Hungary’s M43 highway, linking Mako and Csanadpalota/Nagylak on the Romanian border, is costing some €212 million. The cost of the work is being split 39% and 61% by Hungarian state funds and EU funding respectively. Construction work on the 23km long section will be completed by the end of 2014. The project has to be approved by the European Commission (EC), as it will form part of the trans-European transport network (TEN-T). Plans are to be submitted to the EU by the Hu