Skip to main content

Croatia issues permit for bridge over Sava River

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina. Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports. The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering. Croatia is to pay €70 million as its share for a bridge across the R
March 25, 2019 Read time: 1 min

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina.

Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports.

The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering.

Croatia is to pay €70 million as its share for a bridge across the River Sava near Gradiska, in Republika Srpska, part of Bosnia-Herzegovina.

A year ago, the 2465 European Commission set aside a €6.8 million grant for construction of the bridge.

For more information on companies in this article

Related Content

  • Lueg Bridge work sparks congestion fears
    June 23, 2022
    Lueg Bridge, along Austria’s section of the Brenner Pass route, is slated for major rehabilitation work as part of upgrades to the tolled motorway.
  • LA’s Ribbon of Light viaduct cast into darkness
    January 10, 2024
    Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
  • New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity
    September 7, 2018
    The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
  • Fehmarn Belt Fixed Link could open by 2025 at earliest
    November 27, 2015
    The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry. Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany. Of particular is the time for a construction company t