Skip to main content

Croatia issues permit for bridge over Sava River

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina. Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports. The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering. Croatia is to pay €70 million as its share for a bridge across the R
March 25, 2019 Read time: 1 min

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina.

Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports.

The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering.

Croatia is to pay €70 million as its share for a bridge across the River Sava near Gradiska, in Republika Srpska, part of Bosnia-Herzegovina.

A year ago, the 2465 European Commission set aside a €6.8 million grant for construction of the bridge.

For more information on companies in this article

Related Content

  • €180 million for Bosnia highway
    July 6, 2012
    The EBRD is investing in the largest infrastructure project in Bosnia-Herzegovina (BiH) to date by lending €180 million to the state to construct key sections of the Trans-European Corridor Vc. A key transport artery linking BiH with the rest of Europe, Corridor Vc starts in Budapest, Hungary and ends in the Adriatic Port of Ploce in Croatia. It runs north to south through the centre of BiH, and is the most strategically important link for regional trade and economic development. The €180 million EBRD finan
  • Romania’s latest Danube bridge project shaping up as costly
    September 4, 2017
    The cost for Romania’s newest bridge project over Danube River will likely be around €500 million, according to the latest media reports. Planning and design of the bridge is expected to take 18 months followed by 36 months for construction. The Bridge could be up to 23km including approach roads, depending on routes and geological conditios. It will be built between the towns of Braila and Jijila, in the Dobrogea Region, southeast Romania.
  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Serbia and Bosnia consider options for a Belgrade-Sarajevo project
    December 19, 2016
    Serbia and Bosnia have started talks on constructing a fast highway between the Serbian capital Belgrade and Sarajevo, capital of Bosnia and Herzegovina. Serbian Vice President Zorana Mihajlovic met with the Bosnian minister of transport, Ismir Jusko, to agree on forming a joint working group to consider routes and road construction, according to the Serbian newspaper B92. Mihajlovic said that Serbia's main focus is for building the 100km Pozega-Visegrad section, of which 60km is in Serbia and 40km in