Skip to main content

Croatia issues permit for bridge over Sava River

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina. Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports. The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering. Croatia is to pay €70 million as its share for a bridge across the R
March 25, 2019 Read time: 1 min

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina.

Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports.

The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering.

Croatia is to pay €70 million as its share for a bridge across the River Sava near Gradiska, in Republika Srpska, part of Bosnia-Herzegovina.

A year ago, the 2465 European Commission set aside a €6.8 million grant for construction of the bridge.

For more information on companies in this article

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Bosnia motorway rebuilding work; funding secured
    October 7, 2019
    Funding has been secured to carry out motorway construction and road rebuilding work in the Bosnian autonomous entity Republika Srpska. The European Bank for Reconstruction and Development (EBRD) will provide €351 million to build new motorway connections and improve existing roads in the territory. Of this funding package, €150 million will be used for the Corridor 5 project.
  • Date set to complete D1 Višňové Tunnel section
    July 20, 2023
    The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.
  • Opening date for Romania's Brăila Bridge
    December 15, 2021
    The suspension bridge over the Danube River should be open by the end of next year.