Skip to main content

Croatia issues permit for bridge over Sava River

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina. Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports. The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering. Croatia is to pay €70 million as its share for a bridge across the R
March 25, 2019 Read time: 1 min

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina.

Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports.

The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering.

Croatia is to pay €70 million as its share for a bridge across the River Sava near Gradiska, in Republika Srpska, part of Bosnia-Herzegovina.

A year ago, the 2465 European Commission set aside a €6.8 million grant for construction of the bridge.

For more information on companies in this article

Related Content

  • Bosnia-Croatia link discussed
    July 13, 2012
    Bosnia and Croatia are looking to discuss a new highway construction project to link the two countries. The Adriatic-Ionic section of the Corridor VC motorway looks likely to pass through Bosnia. The plan is to build a total of 110km of roads, out of the planned 336km on the Corridor VC, by 2012.
  • Bosnia’s Autoceste FB&H re-tenders for Pocitelj-Zvirovici project
    July 23, 2018
    Bosnia’ public roads authority Autoceste FB&H has re-tendered for construction of 12km of the Pocitelj-Zvirovici part of the Corridor 5C motorway. The work, including the 945m Pocitelj Bridge, is worth around €100million with financing by the European Investment Bank (EIB). A previous tender was called in 2014 when the contract has been awarded to Strabag and Euroasfalt companies, in spite of better offers from Viadukt and Hering, according to media reports.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m