Skip to main content

Crimea’s Kerch crossing plan

A new plan is calling for the construction of a tolled tunnel under the Kerch Strait. The proposal has been put forward by InzhTekhInvestStroy. Unofficial approval has been given already for the work. Construction could commence as early as December 2015. The work would take until 2018 to complete. The planned tunnel would be 8.5km long with twin tubes, each carrying two lanes of traffic and constructed to a maximum depth of around 100m. The planned tunnel would not compete with the proposed Kerch Strait Br
November 6, 2015 Read time: 2 mins
A new plan is calling for the construction of a tolled tunnel under the Kerch Strait. The proposal has been put forward by InzhTekhInvestStroy. Unofficial approval has been given already for the work. Construction could commence as early as December 2015. The work would take until 2018 to complete. The planned tunnel would be 8.5km long with twin tubes, each carrying two lanes of traffic and constructed to a maximum depth of around 100m. The planned tunnel would not compete with the proposed Kerch Strait Bridge crossing however, according to InzhTekhInvestStroy.

There have been plans to construct a bridge over the Kerch Strait since the 1940s. A temporary structure was built at the end of 1944 during WWII to carry rail traffic supplying the Russian forces but this collapsed due to ice floes in early 1945 and was never rebuilt. The Kerch Strait suffers severe weather conditions that can hamper shipping including ferry traffic.

Related Content

  • New crossing planned for Kerch Strait
    June 10, 2014
    Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnel
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Kerch Strait Bridge project budget
    July 13, 2016
    A new budget projection has been set for Russia’s landmark Kerch Strait Bridge project. A close analysis of the various cost factors has now set the project’s pricetag at US$3.57 billion. Originally the project was expected to cost in the region of $1.5-3 billion but the challenging conditions and the tough winter climate have led to increased costs. The bridge will be 4.5km long and link Russia’s Taman Peninsula with the Crimean Peninsula.
  • Russia’s key bridge link for Kerch Strait
    February 27, 2018
    Russia’s Ministry of Economic Development has said that the Kerch Bridge now looks likely to open to traffic in December 2018. In addition to the bridge, the highway connections should also be complete within the same timeline. The Kerch Strait bridge crossing is of key importance to the area and will help reduce journey times for drivers, as well as reducing transport costs considerably. Construction has not been without its challenges due in part to the fierce winter conditions. This is not the first