Skip to main content

Costs climb for Bangladesh highway

Cost increases have hit the construction of a new highway in Bangladesh. The highway will connect capital Dhaka with Mymensingh. The 87km highway was originally expected to cost US$128 million. However, it now looks set to cost close to $237 million. The project has been beset by delays. The lead contractors for the project are Metallurgical Construction Company of China (MCCC) and Major Bridge Engineering Company (MBEC).
October 30, 2013 Read time: 1 min
Cost increases have hit the construction of a new highway in Bangladesh. The highway will connect capital Dhaka with Mymensingh. The 87km highway was originally expected to cost US$128 million. However, it now looks set to cost close to $237 million. The project has been beset by delays. The lead contractors for the project are Metallurgical Construction Company of China (MCCC) and Major Bridge Engineering Company (5718 MBEC).

For more information on companies in this article

Related Content

  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Australia’s costly A$26 billion East Link Project
    February 5, 2025
    Australia’s East Link Project in Victoria will now cost as much as A$26 billion.
  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
  • Work to restart on key Algerian highway section
    June 18, 2014
    Work looks set to restart on a key section of Algeria’s East-West highway. The country's national highways agency, the ANA, has issued the Japanese group Cojaal with a second formal request to restart work on a 359km section of the highway. Cojaal, along with the Chinese firm Citic-CRCC had been contracted to build 900km of the highway, which links the west of the country with the east. The Chinese section of the highway has been completed (although it was delayed) but Cojaal has yet to finish its section o