Skip to main content

Costa Rican highway under scrutiny

Investigations are in hand in Costa Rica over a series of faults on the highway linking capital San Jose with Caldera. The US$230 million highway has suffered surface cracking in certain stretches, while a number of landslides have also occurred along the route that have required clearing and for repairs to be made. Costa Rica's authorities are investigating Autopistas del Sol following allegations of corruption with regard to the San Jose to Caldera highway project. The investigations are looking at the co
May 3, 2012 Read time: 1 min
Investigations are in hand in Costa Rica over a series of faults on the highway linking capital San Jose with Caldera. The US$230 million highway has suffered surface cracking in certain stretches, while a number of landslides have also occurred along the route that have required clearing and for repairs to be made. Costa Rica's authorities are investigating 1452 Autopistas del Sol following allegations of corruption with regard to the San Jose to Caldera highway project. The investigations are looking at the corruption allegations and whether any improper activities could have been a cause of the route's technical problems.

For more information on companies in this article

Related Content

  • New Argentina highway construction work
    January 11, 2019
    Construction is underway for Argentina’s new Mendoza-San Juan Highway – Mauro Nogarin reports The rehabilitation and maintenance works of more than 3,300km of routes is now underway in Argentina. This followed on after the takeover of six new road corridors under the Public-Private Partnership (PPP) model, which took place in August 2018. The rehabilitation and maintenance works are being carried out prior to the start of the main projects, which will include the construction of highways. Building the
  • Nepal highway subsidence problem causing traffic disturbance
    March 11, 2017
    Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d
  • Scottish mountain highway toast to SuDS
    June 24, 2013
    Highway degradation and surface water pollution in an environmentally sensitive area of the Scottish Cairngorms Mountains, famous for its whisky production, are said to have been tackled with an innovative SuDS Solution from Hydro International. Poor drainage, flooding and freezing weather had led to a landslip and extreme surface degradation along a section of the narrow A95 that descends on a 10% gradient with tight bends to the beautiful village of Craigellachie on the River Spey, near Elgin. Situated im
  • Poor weather causes traffic chaos
    February 23, 2012
    The recent spate of bad weather conditions across the northern hemisphere has paralysed transport in many countries. In the US, much of northern Europe and parts of China, traffic has ground to a halt as a cold winter has resulted in heavy snowfalls in many areas. Minor roads remained blocked for some time and even major highways were badly affected, with vehicles having to be abandoned until roads could be reopened.