Skip to main content

Costa Rican government targets Chinese loan to build major motorway

A 107km road section between San Jose and Limon in Costa Rica could be transformed into a large four-lane motorway using a loan from China of US$395.7 million. The Costa Rican government could add $89 million to the loan, creating a large project budget of $485 million. President Laura Chinchilla has referred the project to the Costa Rican Congress for approval. Chinese firm CHEC will work on the design of this motorway over the next eight months. The project could be finished in three and a half years.
October 16, 2013 Read time: 1 min
A 107km road section between San Jose and Limon in Costa Rica could be transformed into a large four-lane motorway using a loan from China of US$395.7 million. The Costa Rican government could add $89 million to the loan, creating a large project budget of $485 million.

President Laura Chinchilla has referred the project to the Costa Rican Congress for approval. Chinese firm CHEC will work on the design of this motorway over the next eight months. The project could be finished in three and a half years.

Related Content

  • Pakistan’s transport projects are being planned
    April 18, 2017
    Pakistan is planning a massive investment in transport development projects. The country has set a budget of US$1 billion for vital road projects, which have gained approval from Pakistan’s federal Government. The three road infrastructure projects form part of the China-Pakistan Economic Corridor (CPEC). These include a $183 million road link stretching 110km between Basima and Khuzdar, a 210km dual carriageway between Yarik and Zhob costing $725.7 million and a $76.3 million road stretching 280km from Rai
  • China helps Nepal plan capital ring road upgrade
    February 24, 2012
    China is providing technical assistance for the upgrading of the 27km ring road project for Nepalese capital Kathmandu.
  • UK motorway upgrade ahead of schedule
    May 1, 2014
    Joint venture contractor Skanska Balfour Beatty has completed work on a 19km section of the M25 motorway in the UK, six months ahead of schedule. Work on the M25 scheme between junctions 5 and 7 in Kent and Surrey forms part of a new generation of technology-driven improvements on the UK’s strategic road network.
  • Tanzania highway deals won by Chinese contractors
    December 14, 2017
    Two road upgrade contracts in Tanzania have been awarded to four Chinese construction firms. In all the work will be worth some US$312.74 million and will extend to 432km of road improvements.