Skip to main content

Costa Rica project changing hands

The authorities in Costa Rica are transferring the concession for the San Hose-San Ramon highway. The Brazilian firm OAS is taking over the contract from Autopistas del Valle. The National Concessions Agency (CNC) has said that the contract will be similar to the original deal, although some additional works may be added. Extra projects are likely to include a four lane highway between Belen-Santa Ana as well as a new bridge over the Virilla River. In the 2006-2012 period, the cost of the project soared fro
April 20, 2012 Read time: 1 min
The authorities in Costa Rica are transferring the concession for the San Hose-San Ramon highway. The Brazilian firm 1511 OAS is taking over the contract from 5092 Autopistas del Valle. The National Concessions Agency (866 CNC) has said that the contract will be similar to the original deal, although some additional works may be added. Extra projects are likely to include a four lane highway between Belen-Santa Ana as well as a new bridge over the Virilla River. In the 2006-2012 period, the cost of the project soared from US$240 million to the present $511 million. Work has been delayed due to a slow expropriation process as well as a lack of finance.

For more information on companies in this article

Related Content

  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Talks continue for 2025 Gordie Howe opening
    January 18, 2023
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.