Skip to main content

Cost increases for major Chilean highway project

The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
November 15, 2013 Read time: 3 mins
The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost some $1.06 billion. The project is for a 40-year concession package that includes building and operating a 9.3km underground expressway through Santiago. The route runs from El Salto Avenue to Príncipe de Gales Avenue, under the existing Américo Vespucio beltway. Because of the route, the project will be both complex and challenging and MOP also said that firms or joint ventures interested in participating in the tender will now have until December 30th 2013 to submit technical bids, compared to the previous deadline of November 22nd 2013. The ministry will then announce the economic proposals for the concession on January 20th 2014.

The new AVO route will be built on two levels, each one carrying a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour. The project is required as Santiago suffers chronic congestion, particularly at peak periods. The authorities split the long-delayed AVO tender in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The new AVO route will provide the missing link in the city's beltway and was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, this plan attracted strong protests from residents of the La Reina and Peñalolén districts. The 968 Chilean Government opted to split the project and call a tender only for the first 9.3km stretch. However in March 2014 Chile will have a new election and responsibility for the project will then be passed to whichever party wins. Opposition candidate for the presidency, Michelle Bachelet, has previously said she opposed the splitting of the tender and this could further add to the wrangling over the project, as well as adding additional delays.

For more information on companies in this article

Related Content

  • Morocco infrastructure study opening for tender
    April 21, 2016
    Morocco is planning a new infrastructure programme. The country’s Ministry of Equipment, Transport and Logistics is introducing a new tender scheme for a study that will be used to establish the national road infrastructure scheme (Snir) by 2035.
  • Italian Samoter and Asphaltica exhibitions report strong attendance
    May 13, 2014
    The Italian Samoter and Asphaltica 2014 joint exhibition run in Verona, Italy attracted in excess of 40,000 visitors. According to the organisers, the response to the jointly run shows reveals signs of steady recovery for the European market. Of those visitors some 15% came from outside Italy and from 55 countries in all. The top ten nations represented in terms of attendance were France, Germany, Switzerland, USA, The UK, Russia, Slovenia, China, Brazil and Spain. There were 445 exhibiting companies (106 f
  • Mexico is benefiting from heavy transport investment
    October 30, 2013
    A major programme of investment looks set to add new road and highway links to Mexico’s network. The Ministry of Communications and Transport (SCT) has announced planned investments of some US$5.39 billion in several projects in the states of Chiapas, Guerrero, Michoacan and Oaxaca. The 70 projects include 32 road and 14 motorway projects, as well as the expansion of six ports. In addition, the new Las Armas distribution road that will connect the State of Mexico and Mexico city has been inaugurated. The fi
  • Panama continues to plan improved road links
    February 9, 2012
    Three key highway upgrade projects are planned in Panama. Improvement work on the Divisa-Las Tablas road is being split into two sections while the third is for upgrades to the David-Boquete road and the total value of these three contracts has been estimated at US$283 million.