Skip to main content

Cost increases for major Chilean highway project

The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
November 15, 2013 Read time: 3 mins
The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost some $1.06 billion. The project is for a 40-year concession package that includes building and operating a 9.3km underground expressway through Santiago. The route runs from El Salto Avenue to Príncipe de Gales Avenue, under the existing Américo Vespucio beltway. Because of the route, the project will be both complex and challenging and MOP also said that firms or joint ventures interested in participating in the tender will now have until December 30th 2013 to submit technical bids, compared to the previous deadline of November 22nd 2013. The ministry will then announce the economic proposals for the concession on January 20th 2014.

The new AVO route will be built on two levels, each one carrying a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour. The project is required as Santiago suffers chronic congestion, particularly at peak periods. The authorities split the long-delayed AVO tender in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The new AVO route will provide the missing link in the city's beltway and was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, this plan attracted strong protests from residents of the La Reina and Peñalolén districts. The 968 Chilean Government opted to split the project and call a tender only for the first 9.3km stretch. However in March 2014 Chile will have a new election and responsibility for the project will then be passed to whichever party wins. Opposition candidate for the presidency, Michelle Bachelet, has previously said she opposed the splitting of the tender and this could further add to the wrangling over the project, as well as adding additional delays.

For more information on companies in this article

Related Content

  • Border crossing boost for Chile and Argentina
    February 24, 2012
    The authorities in Chile and Argentina are discussing upgrades that can be made to several border crossings between the two countries.
  • New highway infrastructure planned for Nepal
    March 18, 2014
    Interest is said to be strong for a key highway project in Nepal. The project to build the US$1.02 billion Kathmandu-Tarai Fast Track route has attracted interest from China in the shape of the China Infrastructure Investment Corporation (CIIC) and from India with Reliance Infrastructure, and Shapoorji Pallonji. The 76km highway will commence at Khokana and connect capital Kathmandu with Nijgadh. Should CIIC win the deal it has said it will source funding from China’s Exim Bank. The project has been hit by
  • Regensburg road revamp will widen key stretch
    February 16, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar