Skip to main content

Cost increases for major Chilean highway project

The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
November 15, 2013 Read time: 3 mins
The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost some $1.06 billion. The project is for a 40-year concession package that includes building and operating a 9.3km underground expressway through Santiago. The route runs from El Salto Avenue to Príncipe de Gales Avenue, under the existing Américo Vespucio beltway. Because of the route, the project will be both complex and challenging and MOP also said that firms or joint ventures interested in participating in the tender will now have until December 30th 2013 to submit technical bids, compared to the previous deadline of November 22nd 2013. The ministry will then announce the economic proposals for the concession on January 20th 2014.

The new AVO route will be built on two levels, each one carrying a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour. The project is required as Santiago suffers chronic congestion, particularly at peak periods. The authorities split the long-delayed AVO tender in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The new AVO route will provide the missing link in the city's beltway and was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, this plan attracted strong protests from residents of the La Reina and Peñalolén districts. The 968 Chilean Government opted to split the project and call a tender only for the first 9.3km stretch. However in March 2014 Chile will have a new election and responsibility for the project will then be passed to whichever party wins. Opposition candidate for the presidency, Michelle Bachelet, has previously said she opposed the splitting of the tender and this could further add to the wrangling over the project, as well as adding additional delays.

For more information on companies in this article

Related Content

  • Chile-Argentina tunnel receives multiple bids
    June 5, 2017
    Interest has been strong in the tender process for the Agua Negra Tunnel project that will connect Chile and Argentina. In all 10 consortia comprising 29 firms submitted bids to build the tunnel, which will provide a new road link from Coquimbo in Chile to San Juan in Argentina. The winning tender is due to be announced in early 2018. It is highly likely that the winner will include local firms and Chilean companies in particular have access to personnel with experience of tunnelling work due to the country
  • Chile’s Chacao Bridge under construction
    March 6, 2018
    Construction work on Chile’s Chacao Bridge project is now underway. The 2.75km suspension bridge will connect the Chilean mainland with Chiloe Island. The bridge structure has been designed to flex so that It can cope with severe earthquakes, which present a risk in the area. The project is costing US$700 million to carry out with South Korean company Hyundai heading the construction. Building the link should take around five years with its completion set for 2023, although the work could be finished earlie
  • New tunnel between Argentina and Chile proves strong attraction for contractors
    November 27, 2013
    Interest is strong in the project to build the 14km tunnel link between Chile and Argentina, with reports stating that 23 firms having expressed an interest in the work. The twin tube tunnel will connect Argentina’s San Juan Province with Chile’s Coquimbo Province (Region IV) and will be constructed in the Andes Mountains. The Agua Negra project is set to cost somewhere in the range from US$800 million to $1 billion, although the exact price of the project has yet to be determined. Some 72% of the link will
  • Vinci buys Peruvian toll concession holder Lamsac from Invepar
    August 9, 2016
    Vinci Highways has acquired Peruvian toll road operator Lamsac from the Brazilian group Invepar for around US$1.67 billion. The deal is for 100% of Lamsac which is the concessionaire of the Línea Amarilla toll road in the centre of the Peruvian capital Lima. Vinci Highways, which is Vinci Concessions’ international highways subsidiary, also gets the Peruvian company PEX, Lamsac’s electronic toll collection operator. A statement from Vinci said that Lamsacholds a concession contract with the municipali