Skip to main content

Cost increases for major Chilean highway project

The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
November 15, 2013 Read time: 3 mins
The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost some $1.06 billion. The project is for a 40-year concession package that includes building and operating a 9.3km underground expressway through Santiago. The route runs from El Salto Avenue to Príncipe de Gales Avenue, under the existing Américo Vespucio beltway. Because of the route, the project will be both complex and challenging and MOP also said that firms or joint ventures interested in participating in the tender will now have until December 30th 2013 to submit technical bids, compared to the previous deadline of November 22nd 2013. The ministry will then announce the economic proposals for the concession on January 20th 2014.

The new AVO route will be built on two levels, each one carrying a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour. The project is required as Santiago suffers chronic congestion, particularly at peak periods. The authorities split the long-delayed AVO tender in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The new AVO route will provide the missing link in the city's beltway and was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, this plan attracted strong protests from residents of the La Reina and Peñalolén districts. The 968 Chilean Government opted to split the project and call a tender only for the first 9.3km stretch. However in March 2014 Chile will have a new election and responsibility for the project will then be passed to whichever party wins. Opposition candidate for the presidency, Michelle Bachelet, has previously said she opposed the splitting of the tender and this could further add to the wrangling over the project, as well as adding additional delays.

For more information on companies in this article

Related Content

  • Costa Rica to replace Conavi with a National Infrastructure Institute
    March 14, 2016
    Amid concerns over the efficiency of Costa Rica’s highways agency Conavi, the authority has been given more time to provide details on expansion of Route 32, according to the La Republica newspaper. Conavi has been at loggerheads with the Treasury Inspector's Office which wants Conavi to move faster and authorise a contract for the expansion of road between Rio Frio and Limon granted to China Harbour Engineering Company. China Harbour has been requesting further details about the US$395 million projec
  • Chilean deal
    February 6, 2012
    Skanska is preferred bidder to develop the Antofagasta Toll Road in Chile under a PPP model. The firm has beaten tough competition for this project and says it will not require government subsidies for the work, which is due to commence in 2011.
  • Key road upgrade works are underway in the Philippines
    October 26, 2012
    Works are now underway on an upgrade to a 222km stretch of road connecting Samar to Eastern Samar in the Philippines. The US Government is funding the work through its Millennium Challenge programme, which is worth some US$434 million. The road improvement forms part of the Secondary National Roads Development Project and will help boost access for the community. A consortium comprising CM Panco Construction and DM Consunji is now working on the CP 1 contract, which includes a 16km section of road and the T
  • Increased mobility for Mexico
    June 14, 2012
    Urban mobility is high on the infrastructure agenda in Mexico. Business News Americas spoke with Salvador Herrera, executive director of the Centre for Sustainable Transport (CTS), about the elements of a sustainable transport system and Mexico City's addiction to the car At the heart of Mexico City's transport policy is a contradiction that is typical of the country as a whole. The government is spending big on Line 12 of the metro system and has introduced the first Metrobús bus rapid transit (BRT) l