Skip to main content

Cost of Denmark-German link

Discussions on a new link between Denmark and Germany continue with Denmark's Transport Ministry publishing data showing that the proposed bridge option would be more costly than a tunnel.
March 2, 2012 Read time: 1 min
Discussions on a new link between Denmark and Germany continue with Denmark's Transport Ministry publishing data showing that the proposed bridge option would be more costly than a tunnel.


Just one rendering of what a cable-stayed bridge across the Fehmarn Belt could look like

The bridge, at some 19km long, would link Danish island Lolland with the German island Fehmarn and is expected to cost e5.16 billion, a e765 million increase on original projections. However, the tunnel cost is expected to be e5.08 billion, some e496 million less than originally estimate.

Related Content

  • Cost of Denmark-German link
    February 20, 2012
    Discussions on a new link between Denmark and Germany continue with Denmark's Transport Ministry publishing data showing that the proposed bridge option would be more costly than a tunnel.
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Costs revised for Denmark’s proposed Kattegat Bridge
    May 9, 2016
    A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report. The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll. A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the mi
  • New German bridge links
    July 9, 2012
    Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg. The Danish engineering consultancy company Cowi has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.