Skip to main content

Contractor uses explosives to demolish Brazilian overpass

A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.
December 2, 2013 Read time: 1 min
A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 1558 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.

For more information on companies in this article

Related Content

  • Smart constructioon with GIS, GPS design technology
    May 2, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Smart constructioon with GIS, GPS design technology
    February 16, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Underground expansion pushes tunnelling market
    June 13, 2012
    Infrastructure investment means that the road tunnel construction sector is healthy due to demand for new links – Mike Woof reports With many emergent nations investing heavily in infrastructure, the tunnelling sector is seeing extensive business at present. Tunnels provide key links in mountainous areas or in congested cities where building roads on the surface may not be practical. In Asia and Latin America, many key road connections are now being built underground to pass challenging terrain or provide
  • Super job for a Demag CC 3800-1 without a Superlift counterweight
    July 4, 2019
    A Demag CC 3800-1 crane with an 84m-long main boom was recently set up in Germany without a Superlift counterweight to save space. The jobsite was the replacement of the old viaduct on the A45 Freeway that spans the Lahn River near Dorlar in Germany. Bietigheim-Bissingen-based crane service provider Wiesbauer solved the site’s space issues by using a Demag CC 3800-1. “This site required us to lift loads of 96-148tonnes at radii of 40-64m, so there was no option but to use a crawler crane in the 650tonne c