Skip to main content

Contractor STRABAG is building Poland’s S8 route

Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
February 9, 2016 Read time: 1 min
Austrian contractor 945 STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several structures, including a bridge over Pisia Tuczna, as well as pedestrian overpasses and three rest areas. Noise barriers and wildlife crossings will also be built along the section.

For more information on companies in this article

Related Content

  • Important road works for Slovakia
    July 6, 2023
    Important road connection works are underway for Slovakia.
  • Polish road authority GDDKiA will re-tender for the S14
    May 12, 2017
    The Polish ministry of infrastructure announced that it will retender for building the last 27km section of the Expressway S14 around Lodz. Poland’s road authority GDDKiA said it was not satisfied with the offers it had received during the tender. They were higher than the budget by around €59 million, reaching upwards of €487 million. Local governments reportedly fear that construction delays could disrupt the Specialised Expo from June to September, 2022 if the city of Lodz were to be chosen. The wining c
  • Libyan deal for STRABAG
    February 23, 2012
    A consortium headed by STRABAG will handle a highway contract in Libya worth €104 million.
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the