Skip to main content

Contractor STRABAG is building Poland’s S8 route

Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
February 9, 2016 Read time: 1 min
Austrian contractor 945 STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several structures, including a bridge over Pisia Tuczna, as well as pedestrian overpasses and three rest areas. Noise barriers and wildlife crossings will also be built along the section.

For more information on companies in this article

Related Content

  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • Poland’s key road projects
    June 6, 2024
    Major road projects are moving ahead in Poland.
  • Mott Macdonald supervising sections for Poland’s A1 highway
    August 20, 2015
    Mott MacDonald has won the contract to supervise construction of Poland’s A1 highway. The company supervise work for two sections of the A1 highway, a project being co-financed by the country’s General Directorate for National Roads and Motorways and the European Union (EU). The construction of the A1 highway is due to for completion in early 2019. The project is intended to tackle congestion in the city of Czestochowa. It will diverting traffic from the city centre onto the newly constructed 25km highway.
  • STRABAG building two more Polish routes
    January 12, 2018
    Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as