Skip to main content

Contractor STRABAG is building Poland’s S8 route

Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
February 9, 2016 Read time: 1 min
Austrian contractor 945 STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several structures, including a bridge over Pisia Tuczna, as well as pedestrian overpasses and three rest areas. Noise barriers and wildlife crossings will also be built along the section.

For more information on companies in this article

Related Content

  • Poland targets 300km or new roads for Western Pomerania by 2023
    August 1, 2017
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the National Roads Construction Programme. Among the project in the region that borders the country’s Baltic Sea coast is an S3 dual carriageway between the towns of Swinoujscie and Szczecin. Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the
  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra