Skip to main content

Contractor states key Nigerian bridge project on schedule

The consortium building Nigeria’s key Second Niger River Crossing, close to the city of Onitsha, says that the bridge will be ready for traffic on time, according to the contract requirements. The consortium is headed by German owned contractor Julius Berger Nigeria and the PPP package has been set out as a 25 year concession contract. The project is costing close to US$700 million to construct and includes the bridge itself as well as associated road and rail connections as the structure is being designed
May 1, 2014 Read time: 2 mins
RSSThe consortium building Nigeria’s key Second Niger River Crossing, close to the city of Onitsha, says that the bridge will be ready for traffic on time, according to the contract requirements. The consortium is headed by German owned contractor 7740 Julius Berger Nigeria and the PPP package has been set out as a 25 year concession contract. The project is costing close to US$700 million to construct and includes the bridge itself as well as associated road and rail connections as the structure is being designed with multiple traffic lanes for vehicles as well as train tracks.

The new bridge has been has been required for some years as the First Niger River Crossing suffers heavy congestion and is no longer able to cope with traffic demands, as well as having a somewhat unusual history. The first bridge was constructed in 1965 at a cost of around $8.5 million but was then blown up in the 1967-1970 Biafran War, only being rebuilt after hostilities ceased. Concerns have been expressed as to the structural integrity of the first bridge and its long term future given its troubled past. The new structure has been planned for around 20 years, with the foundation Stone having been laid by Olusegun Obasanjo, Nigeria’s then president, in 2007. The new bridge is required to ease traffic delays in the South East of Nigeria, between Delta State and Anambra State. Onitsha is a thriving commercial city and is all a centre for transport and trade in the area.

For more information on companies in this article

Related Content

  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Italy’s horrific bridge collapse is a sign of a wider problem
    January 7, 2019
    The shocking collapse of a major highway bridge in the Italian city of Genoa has highlighted a major problem with regard to poor infrastructure condition in the country. Causing multiple fatalities, the cable-stayed Morandi Bridge suffered a spectacular failure of a central support. Homes have had to be evacuated and it seems likely that the bridge, opened in 1967, will now have to be demolished. However, warnings had been given. The unusual bridge design, with its thin deck and reinforced concrete stays
  • US$1.44 billion funding for Nigerian infrastructure
    June 6, 2024
    US$1.44 billion funding is being secured for Nigerian transport infrastructure works.
  • Czech bridge facing demolition over condition concerns
    October 29, 2018
    A bridge located in Prague, capital of the Czech Republic, is facing calls for its demolition. Concern has been expressed over the condition of the Hlavka Bridge, which spans the Vltava River. The bridge carries heavy vehicle traffic as well as trams and is one of the city’s major transport arteries. It was built originally from 1909 to 1912, replacing an earlier wooden structure. It was then rebuilt so as to cope with vehicle traffic and at present carries up to 100,000 vehicles/day, making it one of the b