Skip to main content

Contractor states key Nigerian bridge project on schedule

The consortium building Nigeria’s key Second Niger River Crossing, close to the city of Onitsha, says that the bridge will be ready for traffic on time, according to the contract requirements. The consortium is headed by German owned contractor Julius Berger Nigeria and the PPP package has been set out as a 25 year concession contract. The project is costing close to US$700 million to construct and includes the bridge itself as well as associated road and rail connections as the structure is being designed
May 1, 2014 Read time: 2 mins
RSSThe consortium building Nigeria’s key Second Niger River Crossing, close to the city of Onitsha, says that the bridge will be ready for traffic on time, according to the contract requirements. The consortium is headed by German owned contractor 7740 Julius Berger Nigeria and the PPP package has been set out as a 25 year concession contract. The project is costing close to US$700 million to construct and includes the bridge itself as well as associated road and rail connections as the structure is being designed with multiple traffic lanes for vehicles as well as train tracks.

The new bridge has been has been required for some years as the First Niger River Crossing suffers heavy congestion and is no longer able to cope with traffic demands, as well as having a somewhat unusual history. The first bridge was constructed in 1965 at a cost of around $8.5 million but was then blown up in the 1967-1970 Biafran War, only being rebuilt after hostilities ceased. Concerns have been expressed as to the structural integrity of the first bridge and its long term future given its troubled past. The new structure has been planned for around 20 years, with the foundation Stone having been laid by Olusegun Obasanjo, Nigeria’s then president, in 2007. The new bridge is required to ease traffic delays in the South East of Nigeria, between Delta State and Anambra State. Onitsha is a thriving commercial city and is all a centre for transport and trade in the area.

For more information on companies in this article

Related Content

  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Nigerian road upgrade deals signed
    August 9, 2022
    New Nigerian road upgrade deals have been signed.
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Nigeria’s FEC approve road works valued at US$768.43 million
    August 22, 2013
    Nigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion). A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months. Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria