Skip to main content

Contract to improve UK port connectivity

The Mott MacDonald Grontmij joint venture (MMG JV) is now working on the contract for the technical assurance role for the A160/A180 link to the Port of Immingham. The road project is located near Grimsby in the UK and is being developed by the Highways Agency as part of the national strategic road network improvement strategy. This is one of four schemes chosen for progression under the accelerated delivery programme and aims to reduce traffic congestion, cut journey times and increase safety. Works includ
April 8, 2014 Read time: 2 mins
The Mersey Gateway is a key project for the area
The 2579 Mott MacDonald Grontmij joint venture (MMG JV) is now working on the contract for the technical assurance role for the A160/A180 link to the Port of Immingham. The road project is located near Grimsby in the UK and is being developed by the 2309 Highways Agency as part of the national strategic road network improvement strategy. This is one of four schemes chosen for progression under the accelerated delivery programme and aims to reduce traffic congestion, cut journey times and increase safety. Works include upgrading of the 5km A160 single carriageway to a dual carriageway, junction enhancements and the construction of a new link road and gyratory system and new bridges. The award will see the MMG JV working with the Highways Agency to support the scheme through to the development phase towards construction, with the possibility of providing support throughout the construction and handover phase.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Mott MacDonald to design highway improvements in Czech Republic
    August 6, 2015
    Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.
  • Mott MacDonald secure prized European Commission contract
    April 1, 2014
    Mott MacDonald has been awarded a €4 million, two-year contract to provide technical assistance to the European Commission's (EC) Directorate-General for Enlargement. The consultancy will support the coordination of socio-economic development interventions initiated and implemented by the EC, international financing institutions and bilateral donors in Western Balkans beneficiary countries as part of their Western Balkans Investment Framework (WBIF) initiative.