Skip to main content

Consultation soon for Vancouver area’s Massey Tunnel replacement

The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
September 19, 2019 Read time: 3 mins

The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next.

A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation.

Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the government website.

“The ministry is working closely with the newly-formed 5067 Metro Vancouver Mayors’ Task Force, indigenous groups, 3100 TransLink, local municipalities and other stakeholders to develop and evaluate crossing options. The target completion for this phase of work is the end of November 2019,” the statement said.

3100 TransLink is the greater Vancouver area’s public transportation network.

In July 2019, the Mayors’ Task Force endorsed a short list of six options, focusing on addressing significant off-peak congestion, managing peak congestion, and providing attractive options for transit and active transportation.

The three six-lane options are a bridge plus two traffic lanes and multi-use path (MUP) in the existing tunnel, a bored tunnel plus two traffic lanes and MUP in the existing tunnel and an immersed tube tunnel plus two traffic lanes and MUP in the existing tunnel.

The three eight-lane options are a bridge with MUP, a bored tunnel plus MUP in the existing tunnel and an immersed tube tunnel plus MUP in a new or the existing tunnel.

In September 2017, the newly elected BC government stopped the design-build-finance-operate-maintain procurement process for a proposed 10-lane 3km cable-stayed bridge costing US$2.8 billion. At the time, local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project, Completion was scheduled for 2022.

One consortium was headed by Spanish company ACS and its local subsidiaries and included Star America Infrastructure Partners and Aecon. Another of the competing consortia comprised Kiewit, Macquarie and Vinci. The third was made up of Fluor, John Laing and SNC-Lavalin.

The plan had been to demolish the tunnel after the a new bridge is opened, although some nearby municipal and city mayors advocated upgrading and twinning the Massey Tunnel - originally called the Deas Island Tunnel when it was opened by Queen Elizabeth in 1959. It carries a four-lane divided highway under the south arm of the Fraser River estuary, joining the city of Richmond to the north with the municipality of Delta to the south.

Meanwhile, Safety and Reliability Improvements work continues on the old tunnel – Canada’s only road tunnel below sea level and which under the now defunct bridge scheme was to have been demolished. Crews have installed higher visibility raised pavement markings on the approaches to and through the tunnel. Roadway and tunnel lighting is being converted to the LEDs. Upgrades to the fire alarm, fire door, ventilation and electrical also continue apace, according to the provincial government.

For more information on companies in this article

Related Content

  • Egypt’s Government has signed key transport deals with Chinese companies
    May 1, 2013
    The Egyptian Government has signed four agreements with Chinese companies that are intended to develop and improve the economic area northwest of the Gulf of Suez. Under the terms of these agreements the Chinese companies will be investing US$500 million into the area with this sum being delivered in three stages. The Egyptian Government expects the move by these companies to attract an additional investment of $1 billion in the region. As part of the development for the area, Egypt's National Authority for
  • Congestion charging proposal for Los Angeles
    January 21, 2019
    A new proposal for congestion charging in Los Angeles has been put forward as a possible solution to the city’s traffic woes. The CEO of the Los Angeles Metro system has suggested that a congestion charge for drivers could be used to allow riders to use the city’s transit system for free. Under the proposed scheme, drivers would be charged for entering certain districts of the city at peak travel periods. The proposal has been put forward as a way of smoothing out transport ahead of the 2028 Olympic Games.
  • More roadblocks for Ontario Highway 413
    September 9, 2020
    A report by environmental groups claims the 400-series motorway is not needed.
  • Colombia: New decree allows pension funds to finance 4G projects
    June 25, 2015
    Columbian president Juan Manuel Santos Colombia has said pension fund money could help finance the country’s ambitious 4G motorway projects. Columbia has 35 road projects underway costing more than US$11.7 billion, including the first two 4G tender waves with six public-private partnerships that have already been approved. During a banking convention held in the coastal city of Cartagena in mid-June, Banco Davivienda president Efrain Forero lending capacity studies have been completed for 4GH projects