Skip to main content

Construction work will start shortly on major Indonesian tollroad

In Indonesia the country’s government intends to speed up preparations for the massive Trans Sumatra tollroad project. This 2,700km highway link is costing close to US$30 billion and much of the work will be carried out by the state-owned contractor, Hutama Kaya. Construction will commence in late-September 2013 and the project is scheduled to be fully open by 2025. This highway will connect all 10 provinces in Sumatra Island through Aceh-Lampung. Phase one of the project is for the construction of four sec
July 22, 2013 Read time: 2 mins
In Indonesia the country’s government intends to speed up preparations for the massive Trans Sumatra tollroad project. This 2,700km highway link is costing close to US$30 billion and much of the work will be carried out by the state-owned contractor, Hutama Kaya. Construction will commence in late-September 2013 and the project is scheduled to be fully open by 2025. This highway will connect all 10 provinces in Sumatra Island through Aceh-Lampung. Phase one of the project is for the construction of four sections with a total length of 324km. These are 17km Medan-Binjai stretch where work will commence first, the 135km Pekan Baru-Dumai section, a 22km stretch from Indralaya-Palembang and a 150km section from Bakauhemi-Terbanggi Besar. However, the 1065 Indonesian Government has said that it may cancel any existing toll road concession deals for sections of the highway as this is a government run project. Work is now starting on the delayed Musi II Bridge project at Palembang in South Sumatra and which will be an important connection for the tollroad. The project calls for a 1.2km bridge to be constructed across the Musi River, as well as a 24km link road. The new bridge will reduce problems of traffic congestion on the existing Ampera Bridge over the Musi River and the project will be financed by a loan worth $400 million from China. Meanwhile Lintas Marga Sedaya (LMS) hopes to complete work on the delayed 116km Cikampek-Palimanan (Cipali) tollroad in Indonesia's West Java by 2015. The Cipali project is part of the Trans-Java network, which consists of 22 tollroads.

For more information on companies in this article

Related Content

  • Delays to highway, tunnel and bridge building
    May 14, 2012
    The Slovakian government is being asked for financial compensation by Granvia, the group building the country’s new Nitra-Banska Bystrica highway. Granvia is building the highway under the PPP model through a 30-year concession deal. The compensation has been requested due to delays that have been caused by the need for archaeological investigations along the route.
  • Bridge savings in Scotland to fund road improvements
    August 27, 2014
    The project to construct the new Forth Crossing close to Scottish capital Edinburgh is looking extremely positive, with cost savings envisaged for the bridge. The Queensferry Crossing scheme now looks to require slightly less funding than had been originally expected when the plans were unveiled in 2011, due in part to tight controls over spending. The bridge costs had been budgeted at close to €2 billion (£1.6 billion) initially but the project now looks likely to cost €1.81 billion (£1.45 billion). The sa
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Cowi and Dissing+Weitling win Shenzhen and Zhongshan bridge deal
    April 18, 2016
    Engineering group Cowi and architecture firm Dissing+Weitling have won the tender for construction of a bridge and tunnel project to connect the Chinese cities of Shenzhen and Zhongshan. The US$5.51 billion 24km project in the southern province of Guangdong will include the world’s widest immersed road tunnel, two signature suspension bridges and two artificial islands. The road in the Pearl River Delta will have eight traffic lanes in two directions and a daily capacity of 90.000 cars, according to a