Skip to main content

Construction of the Gordie Howe Bridge could start in mid-2018

Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project. Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year. The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility
May 12, 2017 Read time: 2 mins
Construction of the US$2.1 billion Gordie Howe International Bridge is expected to start in late 2018, according to the authority in charge of the project.


Preliminary early works on bridge – the second to span the Detroit River ? between Detroit, Michigan in the US and Windsor, in the Canadian province of Ontario have started. A main contractor is likely to be appointed by mid next year.

The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility relocations on the Canadian side of the river, noted the Windsor-Detroit Bridge Authority, a not-for-profit Canadian government corporation. The WDBA is managing the procurement for design, construction, financing, operation and maintenance of the bridge through a public-private partnership for which the WDBA is also responsible for project oversight.

Local media reports said that the WDBA has acquired the necessary land in both countries. This includes paying $22 million for 351 properties in Detroit, some of which belonged to the Moroun family, the American owner of the Ambassador Bridge, the only bridge now across the river.

Manuel “Matty” Moroun has reportedly been trying to put together a project to build another span across the river in a continuing political and economic tussle over the Canadian project. The Gordie Howe toll bridge could threaten toll income on the Ambassador Bridge.

Canada has already completed a major access road, the Herb Gray Parkway, on the Canadian side.

Opening of the bridge is likely to be 2022.

The WDBA recently announced that the new bridge would have pedestrian and cycle access, a move welcomed by the governor of Michigan state and the Canadian government.

A spokesperson for the WBDA said that the contract being tendered will be for maintenance over 30 years.

Related Content

  • Kenya port suspension bridge project makes progress
    January 15, 2019
    A new suspension bridge in Kenya’s key port city, Mombasa, will help unlock potential – Shem Oirere reports Plans for the construction of a US$200 million suspension bridge in Kenya heva moved a notch higher. The country's urban roads agency recently announced the shortlisting of three bidders for the design, finance, construct, operate, maintain and transfer public private partnership (PPP) contract model. Kenya Urban Roads Authority (KURA) is a state agency that manages, develops, rehabilitates and mai
  • Strasbourg bypass surveys halted over environmental concerns
    September 27, 2017
    Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France. The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-