Skip to main content

Construction continues for Colombia’s Toyo Tunnel

Construction work is continuing on Colombia’s Toyo Tunnel project. This is in spite of the controversy regarding one of the firms involved, which has been drawn into the corruption scandal surrounding the Brazilian contractor Odebrecht. The tunnel project is being carried out by a consortium, Consorcio Antioqua al Mar. However the other members of the consortium are in a position to carry on with the project and have all the necessary approvals needed, as well as the necessary equipment. The project is cost
May 9, 2018 Read time: 1 min

Construction work is continuing on Colombia’s Toyo Tunnel project. This is in spite of the controversy regarding one of the firms involved, which has been drawn into the corruption scandal surrounding the Brazilian contractor 1305 Odebrecht. The tunnel project is being carried out by a consortium, Consorcio Antioqua al Mar. However the other members of the consortium are in a position to carry on with the project and have all the necessary approvals needed, as well as the necessary equipment. The project is costing US$666.3 million and should be complete by 2022, improving the road link between Medellin and Uraba.

For more information on companies in this article

Related Content

  • Saudi Arabian capital Riyadh benefiting from major transport investment
    September 9, 2013
    Saudi Arabia is undergoing a series of upgrades to its transport network in a bid to improve Traffic flow rates and boost safety - Mike Woof reports. The massive growth in the use of motor transport worldwide since the start of the 20th century has transformed every country on the planet. But perhaps no country has changed more dramatically than Saudi Arabia, the world’s leading oil producer. At the start of the 20th century Saudi Arabia’s population was small and the country had few industries while it is
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Progress being made for key Chile mega projects
    February 22, 2016
    Progress is being made in Chile for two key mega projects, the Chacao Bridge and the El Melon Tunnel. Chile's Ministry of Public Works (MOP) has ordered the consortium working on the Chacao Bridge project to carry out additional studies. The consortium comprises Systra, OAS, Aas-Jakobsen and Hyundai and the project is worth US$511.45 million. The consortium has to respond to observations made by the MOP on the design proposal presented in August 2014. The works to build the bridge now look likely to continu