Skip to main content

Construction completion for Colombia concession contracts

Colombia’s massive road and highway development programme is still moving ahead, with a series of major concession projects due for completion by 2020. A consortium titled Via al Mar is on track to finish construction of the Cartagena-Barranquilla highway in August 2019, for which the company has a 25-year concession agreement. The tender process for the final stretches of the Ruta del Sol II highway will commence shortly.
December 14, 2017 Read time: 2 mins

Colombia’s massive road and highway development programme is still moving ahead, with a series of major concession projects due for completion by 2020. A consortium titled Via al Mar is on track to finish construction of the Cartagena-Barranquilla highway in August 2019, for which the company has a 25-year concession agreement. The tender process for the final stretches of the Ruta del Sol II highway will commence shortly. This tendering is being managed by Colombia's National Road Institute (2812 Invias). The Accenorte consortium is handling a package of works that will deliver major improvements to roads and highways on the northern side of capital Bogota. Work will include widening the Autopista Norte highway to boost its capacity, with the work due to get underway in spring 2018. A consortium comprising Mario Huertas Cotes (MHC), Constructora Meco, 3215 Constructora Colpatria and Castro Tcherassi should complete construction of the highway project it is working on in early 2018. This project was also award as a 25-year concession package. And a consultancy has a US$2.93 million contract from Colombia's National Infrastructure Agency (ANI) to carry out the planning for a PPP project to develop the road network around Cauca and Valle de Cauca.

For more information on companies in this article

Related Content

  • Colombia road upgrades being planned
    January 25, 2019
    Major upgrades are being planned to Colombia’s road network. A report produced by Colombia's national road institute (Invias) has revealed that just 13.6% of the country’s 7,019km key road network is in very good condition. Of concern is that 17.7% of Colombia’s key road network is in poor condition, with 0.86% in very poor state. Around 33.6% is in good condition and 34.3% is in average condition. The report reveals that Colombia’s Cordoba Department has the worst roads, followed by Ocana Department. Me
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Ecuador road widening project planned
    July 3, 2018
    A road widening project worth US$134.3 million is now going ahead in Ecuador. The road connecting Aloag with Santo Domingo is being improved along a 100km stretch, widening the route so that it will feature two lanes in either direction instead of the single lane in either direction at present. This will boost the transport connection between Pichincha Province and Santo Domingo de los Tsachilas Province. The contract was originally awarded in 2015 but stalled in 2017 following a disagreement over tolling.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.