Skip to main content

Construction commencing for Mersey gateway project

Work is now starting on the road links that will connect to the new Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finishe
September 15, 2014 Read time: 2 mins
Work is now starting on the road links that will connect to the new 6126 Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finished by April 2015. While the project is being carried out, a 64km/h (40mph) speed limit will be implemented so as to ensure safety for construction personnel and this will be enforced for the next 42 months. To allow access to the site by workers, traffic management will be in place, with intermittent off-peak closures of lane one of all approaches to the roundabout. Once complete, the junction will provide a faster link between the M56 motorway and the new main route through Runcorn to the Mersey Gateway Bridge. The project will offer a series of economic, transport and social benefits to the region when it opens in 2017. Both the new bridge and the Silver Jubilee Bridge will be tolled but will be free to all residents.

For more information on companies in this article

Related Content

  • New Mersey gateway bridge project underway
    September 23, 2015
    Work is starting on the approach viaducts for the new Mersey Gateway Bridge in the UK. The project is using longest bridge-building machine in Europe, which was named during a ceremony to mark the latest key stage the Mersey Gateway Project. Most machines of this kind can only build bridge spans of up to 60m. However, the MSS for the Mersey Gateway Bridge was specially made so it is able to cast spans of up to 70m.
  • Mersey Gateway Project reaches half-way point across the Mersey
    March 10, 2017
    The Mersey Gateway project in England has passed a significant milestone, with over half of the main bridge deck stretching across the River Mersey. Work to install stay cables on the main bridge also passed a key point, with installation of the 31st 150m long cable – the halfway point for stay cable installations on the pylon. When complete, 146 stay cables will support the 1km-long reinforced concrete bridge, with a combined load-bearing weight of more than 53,000tonnes. “We’re now more than 50
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p