Skip to main content

Construction commencing for Mersey gateway project

Work is now starting on the road links that will connect to the new Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finishe
September 15, 2014 Read time: 2 mins
Work is now starting on the road links that will connect to the new 6126 Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finished by April 2015. While the project is being carried out, a 64km/h (40mph) speed limit will be implemented so as to ensure safety for construction personnel and this will be enforced for the next 42 months. To allow access to the site by workers, traffic management will be in place, with intermittent off-peak closures of lane one of all approaches to the roundabout. Once complete, the junction will provide a faster link between the M56 motorway and the new main route through Runcorn to the Mersey Gateway Bridge. The project will offer a series of economic, transport and social benefits to the region when it opens in 2017. Both the new bridge and the Silver Jubilee Bridge will be tolled but will be free to all residents.

For more information on companies in this article

Related Content

  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports
  • VIDEO: Switzerland’s Astra Bridge concept to be tendered
    May 23, 2019
    Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept. The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency. The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.