Skip to main content

Consortium wins third Bosphorus bridge deal

A consortium formed by ICTAS of Turkey and the Italian firm Astaldi has won a tender to build a third suspension bridge over Istanbul’s Bosphorus. Despite criticism from planners and environmentalists, the 1.3km structure, the longest over the strait, has been given the go-ahead by Turkey’s Transport Minister, Binari Yildirim. A joint venture of local company IC Içtas Insaat and Italian Astaldi has won the tender for the project, and Minister Yildirim is reported as saying the bridge would be built in three
December 3, 2012 Read time: 2 mins

A consortium formed by ICTAS of Turkey and the Italian firm Astaldi has won a tender to build a third suspension bridge over Istanbul’s Bosphorus.

Despite criticism from planners and environmentalists, the 1.3km structure, the longest over the strait, has been given the go-ahead by Turkey’s Transport Minister, Binari Yildirim.

A joint venture of local company 3015 IC Içtas Insaat and Italian 1324 Astaldi has won the tender for the project, and Minister Yildirim is reported as saying the bridge would be built in three years at an anticipated cost of €2 billion (US$1.55 billion).

The project is designed to relieve congestion in Istanbul, a city of over 13 million people, and the plan is for trucks to use the bridge instead of clogging up roads elsewhere. Critics say it will simply attract more traffic, and will damage the landscape.

The Gebze-Orhangazi-Izmir Highway project, which is planned to connect three industrial regions, will reduce the traffic between Gebze, near Istanbul, and the Aegean city of Izmir by 30%, says the highways authority.

The bridge is part of the Northern Marmara highway project.

It is also reported that French bridge designer Michel Virlogeux’s design for the third Bosphorus bridge could be modelled on the Brooklyn Bridge in New York.

For more information on companies in this article

Related Content

  • VIDEO: Life in the (very) fast lane on Turkey’s Osman Gazi Bridge
    July 5, 2016
    Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows. In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire. Turkish media outlet TRTWorld reported that the bike had small win
  • Deutsche Bank and Akbank among banks to fund Gebze-Izmir motorway
    March 19, 2015
    A final financing agreement for Turkey's 421km Gebze-Izmir motorway project will be signed by nine banks, eight of which will be Turkish, in April. The agreement will be for around US$4.73 billion of the deal likely to cost in total more than $6 billion and which is the country’s largest public-private partnership project. The banks are Deutsche Bank and Turkish banks Akbank, Garanti Bankasi, Finansbank, Is Bankasi, Halkbank, Ziraat Bankasi, Yapi Kredi and Vakfbank. Work has been going on since 2010 for the
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders
    May 23, 2016
    Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

    The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.