Skip to main content

Consortium wins St Petersburg bypass contract

A civil engineering tender worth U$4.73 billion for work in Saint Petersburg, Russia, has been awarded to a consortium of Russian, Italian and Turkish companies.
February 27, 2012 Read time: 1 min
A civil engineering tender worth U$4.73 billion for work in Saint Petersburg, Russia, has been awarded to a consortium of Russian, Italian and Turkish companies.
The consortium is led by Russian bank 3012 VTB and also consists of Italian civil engineering group 1324 Astaldi, Russian bank 3014 Gazprombank, Turkish construction companies 3015 IC and 3017 Mega Yapi, and GBP Infrastructure.
The contract covers the construction of an 11km road bypass and bridge between the city's port and its residential districts.
In a separate development, about $3.92 billion will be allocated for road construction in the Russian capital Moscow in 2012 under a targeted investment programme of the city. About $4.9 billion will be invested in 2013 and $5 billion in 2014.

For more information on companies in this article

Related Content

  • Turkish firm wins Russia road, bridges and tunnel deal
    August 9, 2017
    A new road project is planned for Ufa, capital of Bashkortostan, which is part of the Russian Federation. A partnership between Turkish contractor Limak Holding and Russian firm VTB Capital will handle the project, which is expected to cost US$570 million. The project will see the construction of a 12.5km long highway and includes the construction of a 1.25km tunnel section as well as 2.6km of bridge stretches over a four year period. The partners have set up a joint business, Bashkir Concession Company, to
  • New highway stretches for Russia
    May 21, 2020
    New highway stretches are being planned for Russia.
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • Funding for key Russian highway projects
    May 10, 2012
    A notable partnership deal looks set to provide funding for key Russian highway projects. A memorandum of cooperation has been signed between the state-owned Russian Highways (Avtodor) and the European Bank for Reconstruction and Development (EBRD). Under this deal the EBRD may provide loans to Avtodor, redeem bonds, or co-operate on concession agreements. This funding stream will allow Avtodor to implement its key PPP projects. Avtodor and the EBRD have been discussing the highway linking Moscow with St Pe