Skip to main content

Concession tender for Brazilian bridge

Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic
December 8, 2014 Read time: 2 mins
Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at which time it was the world’s second longest bridge (after the Lake Pontchartrain Causeway in the US). Because of the type of construction used, the bridge’s length and its age, the concession package is substantial and some US$535 million in investment will be required. The bridge is of note from a design perspective due to the 72m high central span, which allows for the passage of shipping. Providing a key link for the BR-101 highway across Guanabara Bay and carrying an estimated 140,000 vehicles/day, the tolled bridge and features eight lanes in all, with four in either direction.

Related Content

  • US$600 million for Cape Fear bridge replacement?
    February 14, 2024
    An estimate of up to US$600 million has been suggested for North Carolina’s Cape Fear bridge replacement.
  • New Brazilian highway tender opening
    January 28, 2014
    The tender process is opening for a highway project in Brazil's southern Paraná State. The project will be carried out under the PPP model and the deal is worth some US$3.21 billion. The package of works necessary will require widening, improving, maintaining and operating state highway PR-323 as well as a number of adjacent roads. The package is for a 30-year concession and involves widening 207km of highway between the towns of Paiçandu and Francisco Alves in the northeast of the state, according to a rep
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Colombian concession contracts cause concern
    June 13, 2014
    A report from insurance firm AIG warns that up to half of Colombia's 4G highway concessions could face financial hurdles due to over-estimated predictions of traffic flows. Colombia is at present putting out to tender its fourth generation (4G) concessions, which involve some US$25 billion in investment, reports Business News America. This investment is impressive and is Latin America's biggest move to expand and improve road infrastructure. But while many companies have shown interest and were prequalified