Skip to main content

Concern over Serbian bridge project behind schedule

There is concern in Serbia over delays to the Zemun-Borca bridge project. Costing some €197 million in total for the bridge and its access roads, the project is due for completion in December 2014. However Serbia’s Ministry of Construction is investigating why the project is not on track and wants to bring the work back into line with the planned schedule. The Serbian Government is funding 15% of the project while China’s Exim Bank is providing 85%. The Chinese contractor China Road and Bridge Corporation i
August 28, 2014 Read time: 1 min

There is concern in Serbia over delays to the Zemun-Borca bridge project. Costing some €197 million in total for the bridge and its access roads, the project is due for completion in December 2014. However Serbia’s Ministry of Construction is investigating why the project is not on track and wants to bring the work back into line with the planned schedule. The Serbian Government is funding 15% of the project while China’s Exim Bank is providing 85%. The Chinese contractor 3366 China Road and Bridge Corporation is carrying out the construction work.

For more information on companies in this article

Related Content

  • Serbia: end in sight for finishing southern part of Corridor 10
    August 26, 2016
    Serbia’s minister of construction and infrastructure, Zorana Mihajlovic, said that the southern part of the Corridor 10 motorway is expected to be completed by the end of 2017. Speaking to the Beta news agency, she also said that work on the Corridor 11 motorway, on the Ub-Lajkovac section, is being carried out in cooperation with Chinese partner company Shang Dong. The government has also signed an agreement for construction of the Surcin-Obrenovac part of the Corridor 11. Ongoing talks between Serbi
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • China’s Exim Bank to fund two new Macedonia highways
    November 15, 2013
    The Chinese Exim Bank is providing much of the funding for two highway projects in Macedonia. The construction work will be carried out by a Chinese contractor, which has signed a deal with the Macedonian Government. The Chinese Sinohydro Corporation will build two stretches of highway linking Kicevo-Ohrid and Miladinovci-Stip. These will measure 56.7km and 53km long, respectively. Some 90% of the construction costs will come from the Macedonian Government, with this €580 million being provided by the loan
  • Another bridge over the River Drina
    October 29, 2020
    Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.