Skip to main content

Completion date for stretches of Vietnam’s key project

The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project. The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaini
October 25, 2018 Read time: 2 mins
The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project.


The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaining existing routes. The country’s Directorate for Roads intends to spend an estimated $12.86 billion over the next 10 years on renovating national highways.

Meanwhile in Dan Nang city, a new $40.8 million flyover will be built at the Tran Thi Ly Bridge junction. In addition, a two tunnel project will be driven at a junction west of Rong (Dragon) bridge. The 562m tunnels will connect Tran Phu Street with September 2 Street, as well as Bach Dang Street and September 2 Street. A tunnel for pedestrian will be part of the tunnel road and a Bus Rapid Transit station will also be built on Nguyen Van Linh Street. The flyover will be built at the junction of September 2 Street and Duy Tan Street an should be complete by 2020. A 203m steel bridge will be constructed at September 2 Street. In addition, a roundabout at ground level road and a 750m tunnel on Duy Tran street will be included in the flyover project.

Related Content

  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.