Skip to main content

Completion date for stretches of Vietnam’s key project

The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project. The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaini
October 25, 2018 Read time: 2 mins
The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project.


The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaining existing routes. The country’s Directorate for Roads intends to spend an estimated $12.86 billion over the next 10 years on renovating national highways.

Meanwhile in Dan Nang city, a new $40.8 million flyover will be built at the Tran Thi Ly Bridge junction. In addition, a two tunnel project will be driven at a junction west of Rong (Dragon) bridge. The 562m tunnels will connect Tran Phu Street with September 2 Street, as well as Bach Dang Street and September 2 Street. A tunnel for pedestrian will be part of the tunnel road and a Bus Rapid Transit station will also be built on Nguyen Van Linh Street. The flyover will be built at the junction of September 2 Street and Duy Tan Street an should be complete by 2020. A 203m steel bridge will be constructed at September 2 Street. In addition, a roundabout at ground level road and a 750m tunnel on Duy Tran street will be included in the flyover project.

Related Content

  • Taiwanese firm building Vietnam road
    June 17, 2013
    A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construct
  • UAE: Mohammed Bin Zayed City to get road improvements
    March 14, 2016
    Major roadworks within Mohammed Bin Zayed City are among recently announced projects, including electricity, street-lighting and storm-water drainage systems, to be funded by more than US$128 million. The projects covered by the funding were announced by Abu Dhabi officials in the United Arab Emirates. Earlier this year, the Roads and Transport Authority in Dubai awarded contracts worth $131 million for a series of road, bridge, crossing and tunnel upgrades. The projects include a new flyover, a signa
  • Vietnam-Laos expressway under consideration
    October 11, 2021
    A new expressway linking Vietnam and Laos is under consideration.
  • Moscow’s road infrastructure timetable to 2016
    August 23, 2013
    According to plans for Moscow road infrastructure, issued by the Department of Construction, 215km of roads, 78 artificial structures and around 150 pedestrian underpasses should be reconstructed and built in Russia’s capital by 2016. Around 87.3km of road surface will be renovated and 11 artificial structures will be built on 11 major highways. Another 30.5km of roads and eight artificial structures will open as a part of a new road network project for the development of Skolkovo innovation centre. A fu