Skip to main content

Completion date for stretches of Vietnam’s key project

The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project. The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaini
October 25, 2018 Read time: 2 mins
The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project.


The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaining existing routes. The country’s Directorate for Roads intends to spend an estimated $12.86 billion over the next 10 years on renovating national highways.

Meanwhile in Dan Nang city, a new $40.8 million flyover will be built at the Tran Thi Ly Bridge junction. In addition, a two tunnel project will be driven at a junction west of Rong (Dragon) bridge. The 562m tunnels will connect Tran Phu Street with September 2 Street, as well as Bach Dang Street and September 2 Street. A tunnel for pedestrian will be part of the tunnel road and a Bus Rapid Transit station will also be built on Nguyen Van Linh Street. The flyover will be built at the junction of September 2 Street and Duy Tan Street an should be complete by 2020. A 203m steel bridge will be constructed at September 2 Street. In addition, a roundabout at ground level road and a 750m tunnel on Duy Tran street will be included in the flyover project.

Related Content

  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • New underground road project proposed for Brisbane
    August 19, 2022
    A new underground road project is being proposed for Brisbane.
  • Regensburg road revamp will widen key stretch
    February 16, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the
  • New Chinese road projects
    August 17, 2020
    Major new Chinese road projects are being planned.