Skip to main content

Colombia’s Toyo Tunnel project underway

Construction is ongoing for Colombia’s Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.
September 14, 2018 Read time: 1 min
Construction is ongoing for Colombia’s 4868 Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.


The highway project for which the Toyo Tunnel forms a key stretch is split into two main stretches. The first section includes 17 bridges, seven tunnels and 4.4km of road, with Antioquia Al Mar holding the concession. The second section measures 19.4km with 11 tunnels and 13 bridges. Colombia’s national Road Institute (Invias) will award the contract for this second section of the route at the start of 2019.

For more information on companies in this article

Related Content

  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Egyptian Government opening key project tender
    May 11, 2012
    The Egyptian Government is opening the tender process for the Rod el Farag highway in July 2012. The highway project is expected to cost US$1 billion to construct and will be carried out in two stages. One section will run from Alexandria Desert Road to the Cairo Ring Road. Meanwhile the second section will run from the Cairo Ring Road to the eastern side of the Nile-Shoubra area and the Al Ismailia Canal Road.
  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.