Skip to main content

Colombia’s Toyo Tunnel project underway

Construction is ongoing for Colombia’s Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.
September 14, 2018 Read time: 1 min
Construction is ongoing for Colombia’s 4868 Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.


The highway project for which the Toyo Tunnel forms a key stretch is split into two main stretches. The first section includes 17 bridges, seven tunnels and 4.4km of road, with Antioquia Al Mar holding the concession. The second section measures 19.4km with 11 tunnels and 13 bridges. Colombia’s national Road Institute (Invias) will award the contract for this second section of the route at the start of 2019.

For more information on companies in this article

Related Content

  • Colombia: Estructura Plural SAC 4G is awarded motorway concession
    July 2, 2015
    Estructura Plural SAC 4G has been awarded the motorway concession Autopista Mar 1 in Colombia. The 176km road between Fernando Gomez Martinez Tunnel will run across San Jeronimo and Santafe, reaching Canasgordas. The project will cost US$565.12 million and have 41 bridges and 17 tunnels. The existing road will be improved and a second lane added between Medellin and Santa Fe. Meanwhile, Colombian construction firm Construcciones El Condor and the national infrastructure agency ANI have signed a pu
  • Colombia investing in new highways
    February 10, 2014
    Colombia's national infrastructure agency (ANI) has prequalified 10 companies for its US$770 million highway project Autopista al Mar 2. This new route will improve connections in western Antioquia department between Medellín and the Pacific coast, according to Business News Americas. The project is for the operation and maintenance of 176km of highways, as well as the construction of 41 bridges and 19 tunnels. Among the companies prequalified are Spain's Sacyr, Cintra, Acciona and OHL, France's Vinci, and
  • Colombia: PPP for motorway between Cesar and La Guajira
    March 11, 2015
    In Colombia, the Council of Ministers has given official approval to a fourth public-private partnership (PPP), this time for a motorway between Cesar and La Guajira. The 350km road, costing an estimated US$151 million, will connect San Roque with Cuestecita, take four years to build and employ around 1,400 workers. The announcement comes Columbia’s National Infrastructure Agency said it will help finance construction of the Toyo tunnel in Antioquia. The tunnel, nearly 10km-long and costing almost $765, wil
  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario