Skip to main content

Colombia’s Tesalia Tunnel drive complete

Driving the bore for Colombia’s new Tesalia Tunnel is now complete. The 3.5km tunnel forms part of the Pacifico 3 road project.
By MJ Woof April 20, 2020 Read time: 1 min
Driving of the Tesalia Tunnel in Colombia is now complete - image courtesy © Vasile Bobirnac, Dreamstime.com

 

Now that that driving work is finished, the engineers will complete the lining of the tunnel and then carry out surfacing and installation of the lighting and ventilation systems. The tunnel is expected to be ready for traffic in 2021.

Work on the Pacifico 3 road project is well underway. The 146km route links Colombia’s Risaralda Department, Caldas Department and Antioquia Department. The project has so far cost US$989 million.

Related Content

  • Major tunnel project underway in Bangladesh
    March 1, 2019
    A major tunnel construction project is now underway in Bangladesh, the first tunnel in the country to be constructed under a river.
  • Norwegians would build new bridge and tunnel links
    June 18, 2021
    Norway’s road transport network is changing radically as the country gears up for greater EV use as well as a gradual phasing out of its traditional ferry links
  • Colombia highway construction projects planned
    September 28, 2017
    A series of highway and tunnel projects are planned for Colombia’s Antioquia Department. These new tunnel and highway projects form part of Colombia’s 4G infrastructure development programme. In all 19 tunnel stretches are planned for the eight highways being built in Antioquia as part of the 4G programme. The new highways are providing 28,000 jobs in all and will improve transport connections between Antioquia Department and Colombia’s Atlantic and Pacific coasts.
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off