Skip to main content

Colombia’s Tesalia Tunnel drive complete

Driving the bore for Colombia’s new Tesalia Tunnel is now complete. The 3.5km tunnel forms part of the Pacifico 3 road project.
By MJ Woof April 20, 2020 Read time: 1 min
Driving of the Tesalia Tunnel in Colombia is now complete - image courtesy © Vasile Bobirnac, Dreamstime.com

 

Now that that driving work is finished, the engineers will complete the lining of the tunnel and then carry out surfacing and installation of the lighting and ventilation systems. The tunnel is expected to be ready for traffic in 2021.

Work on the Pacifico 3 road project is well underway. The 146km route links Colombia’s Risaralda Department, Caldas Department and Antioquia Department. The project has so far cost US$989 million.

Related Content

  • Virginia tunnel and bridge expansion stage complete
    April 26, 2024
    A key stage of the Virginia tunnel and bridge project is stage complete.
  • Indian road projects underway
    April 20, 2023
    Indian road network development projects are underway.
  • Colombia's roads to recovery
    February 8, 2012
    Colombia's Ministry of Transport is suggesting that the Avenida Longitudinal de Occidente (ALO) road project in Bogota should be carried out by Colombian energy company Empresa de Energia de Bogota (EEB).
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk