Skip to main content

Colombia’s new tunnel providing engineering challenge

The Toyo tunnel being planned in Colombia will provide several engineering challenges according to reports. Located in Antioquia, the tunnel lies in an area with tricky topography. The project is expected to cost some US$783 million to build with the tunnel being located at an altitude of around 1,500m.
June 4, 2015 Read time: 1 min
The Toyo tunnel being planned in Colombia will provide several engineering challenges according to reports. Located in Antioquia, the tunnel lies in an area with tricky topography. The project is expected to cost some US$783 million to build with the tunnel being located at an altitude of around 1,500m.

Related Content

  • Meeting engine emission regulations challenges
    February 16, 2012
    New engine emission regulations pose major challenges for engine manufacturers - Geoff Ashcroft reports. The arrival of emissions regulations in January for engines over 130kW has meant that engine makers have adopted varied technologies to meet and exceed those goals. For the end user though, buying new kit that complies with Tier 4 Interim/Stage IIIB emissions regulations is likely to carry additional costs.
  • New bridge to span Zambezi River and link Zambia and Botswana
    August 14, 2014
    Work is starting on a new bridge that will span the Zambezi River and link Zambia with Botswana. The bridge will be located at Kazungula and will carry both road and rail connections. The structure will be some 923m long and the project is expected to cost in the region of US$200 million, with work including the construction of access roads as well as the border posts on either side of the Zambezi River. This new link will replace the existing ferry connection, improving transportation between Zambia and Bo
  • Colombian highway costs spiral
    February 15, 2012
    Cost increases are affecting a major highway project in Colombia.
  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.